Construction has started on the Expo station on Riyadh Metro Line 4 (Yellow Line), designed to handle 19,000 passengers an hour. Freyssinet Saudi Arabia holds the design-and-build contract, awarded by the Royal Commission for Riyadh City in September 2026 (MEED). The station will serve the Expo 2030 site and connect it to the wider metro network.
This intelligence item was sourced from وكالة الأنباء السعودية. Click below to read the complete original article.